• Home
  • Browse
    • Current Issue
    • By Issue
    • By Author
    • By Subject
    • Author Index
    • Keyword Index
  • Journal Info
    • About Journal
    • Aims and Scope
    • Editorial Board
    • Publication Ethics
    • Peer Review Process
  • Guide for Authors
  • Submit Manuscript
  • Contact Us
 
  • Login ▼
    • Login
    • Register
  • العربیة
Home Articles List Article Information
  • Save Records
  • |
  • Printable Version
  • |
  • Recommend
  • |
  • How to cite Export to
    RIS EndNote BibTeX APA MLA Harvard Vancouver
  • |
  • Share Share
    CiteULike Mendeley Facebook Google LinkedIn Twitter
International Design Journal
arrow Articles in Press
arrow Current Issue
Journal Archive
Volume Volume 15 (2025)
Issue Issue 4
Issue Issue 3
Issue Issue 2
Issue Issue 1
Volume Volume 14 (2024)
Volume Volume 13 (2023)
Volume Volume 12 (2022)
Volume Volume 11 (2021)
Volume Volume 10 (2020)
Volume Volume 9 (2019)
Volume Volume 8 (2018)
Volume Volume 7 (2017)
Volume Volume 6 (2016)
Volume Volume 5 (2015)
Volume Volume 4 (2014)
Volume Volume 1 (2012)
Badawy, M., Hussien, M. (2025). Improving Productivity of Men's Suit Jacket Production Lines through Time Study "Case Study". International Design Journal, 15(1), 281-298. doi: 10.21608/idj.2024.329194.1205
Mostafa Badawy; Marim Hussien. "Improving Productivity of Men's Suit Jacket Production Lines through Time Study "Case Study"". International Design Journal, 15, 1, 2025, 281-298. doi: 10.21608/idj.2024.329194.1205
Badawy, M., Hussien, M. (2025). 'Improving Productivity of Men's Suit Jacket Production Lines through Time Study "Case Study"', International Design Journal, 15(1), pp. 281-298. doi: 10.21608/idj.2024.329194.1205
Badawy, M., Hussien, M. Improving Productivity of Men's Suit Jacket Production Lines through Time Study "Case Study". International Design Journal, 2025; 15(1): 281-298. doi: 10.21608/idj.2024.329194.1205

Improving Productivity of Men's Suit Jacket Production Lines through Time Study "Case Study"

Article 20, Volume 15, Issue 1 - Serial Number 65, January and February 2025, Page 281-298  XML PDF (1.59 MB)
Document Type: Original Article
DOI: 10.21608/idj.2024.329194.1205
View on SCiNiTO View on SCiNiTO
Authors
Mostafa Badawy email 1; Marim Hussien2
1Faculty of Technology of Industry and Energy, Samannoud Technological university
2Faculty of Applied Arts, Damietta University
Abstract
Today, the ready-made garment industry faces some challenges in terms of quality, on-time delivery and cost. To improve these aspects, it is necessary to improve productivity. Although the ready-made garment industry has many departments, the processes in the production hall as well as the labor in the production lines play a major role. Therefore, the proper use of line balancing technology can help the production line achieve better productivity. Productivity in ready-made garment factories is a vital measure of operational efficiency and competitiveness. It can be defined in terms of the effectiveness of labor, materials and equipment, and measured using various methods, including time and motion studies, line balancing, standard minute value, efficiency measures, and lean manufacturing techniques. By using these methods, ready-made garment factories can identify inefficiencies, streamline operations and significantly enhance their productivity. Measuring productivity is of utmost importance. Enhancing productivity is essential to increasing profits using the same resources. In this research, a case study was conducted in one of the men's suit factories for the men's suit jacket product, where the current situation of the current suit jacket production lines was analyzed using a time study and some improvements were made to the path of some production processes to achieve the highest productivity and balance the production lines to obtain the best use of equipment, raw materials and labor, and develop an appropriate model to improve the productivity of men's suit jacket.
Keywords
Improving Productivity; Men's Suit Jacket Production Lines; Time Study
Supplementary Files
download 281-298-Badawy-abs.pdf
References

1-     Halder, P., C. L. Karmarker, B. Kundu and T. Daniel (2018). "Evaluation of factors affecting the productivity of RMG in Bangladesh: A fuzzy AHP approach." International journal of research in industrial engineering 7(1): 51-60.

2-     Jayakumar, A. and A. K. Krishnaraj (2017). "Productivity improvement in stitching section of a garment manufacturing company." Int. J. Innov. Res. Adv. Eng 4: 8-11.

3-     Johnson, P., & Lee, S. (2020). Efficiency Metrics in Garment Manufacturing. International Journal of Production Research, 58(4), 897-910.

4-     Khatun, M. M. (2013). "Application of industrial engineering technique for better productivity in garments production." International Journal of Science, Environment and Technology 2(6): 1361-1369.

5-     Kumar, R. (2016). Technological Innovations in the Garment Industry: An Overview. Journal of Fashion Technology and Textile Engineering, 4(1), 58-68.

6-     MA, S., M. Zawad and T. Rahman (2023). "Productivity improvement of a sewing line of a garment factory by line balancing." Research Journal of Engineering Sciences  ISSN 2278: 9472.

7-     Mazumder, S. (2014). "Productivity improvement in readymade garments industry: a case study."

8-     Moktadir, M. A., S. Ahmed, F. T. Zohra and R. Sultana (2017). "Productivity improvement by work study technique: a case on leather products industry of Bangladesh." Ind. Eng. Manag 6(1): 1000207.

9-     Nguyen, T., Tran, H., & Le, V. (2019). The Impact of Standard Minute Value on Productivity in Garment Manufacturing. Journal of Textile and Apparel, Technology and Management, 9(3), 45-59.

10-  Rahman, M., & Siddiqui, T. (2015). Workforce Training and Its Impact on Productivity in Garment Factories. Journal of Human Resources Management, 6(2), 134-145.

11-  Rana, M. B., Islam, R., & Ahmed, S. (2020). Supply Chain Management in the Ready-Made Garment Industry: Practices and Performance. Global Journal of Logistics and Supply Chain Management, 10(1), 45-58.

12-  Samad, M. A., P. P. Chowdhury, G. Rabbani and M. N. A. S. Uzzal (2023). "Study of a Sewing Line of an RMG Factory and Productivity Improvement through Line Balancing." Asian Journal of Engineering and Applied Technology 12(1): 1-9.

13-  Smith, R., & Jones, T. (2017). Productivity Measurement in the Ready-Made Garment Industry. Journal of Fashion Technology and Textile Engineering, 5(1), 34-48.

14-  Shumon, M. R. H., K. Arif-Uz-Zaman, A. Rahman and B. Khulna (2010). Productivity improvement through line balancing in apparel industries. Proceedings of the 2010 International Conference on Industrial Engineering and Operations Management.

15-  Stevenson, W. J., M. Hojati and J. Cao (2014). Operations management, McGraw-Hill Education New York.

16-  ur Rehman, A., M. B. Ramzan, M. Shafiq, A. Rasheed, M. S. Naeem and M. M. Savino (2019). "Productivity improvement through time study approach: a case study from an apparel manufacturing industry of Pakistan." Procedia Manufacturing 39: 1447-1454.

Statistics
Article View: 130
PDF Download: 105
Home | Glossary | News | Aims and Scope | Sitemap
Top Top

Journal Management System. Designed by NotionWave.