Farghaly, Z., Al-Muslimi, S., Hosseini, E. (2021). The effect of employing Radiesthesia to improve the performance of the sewing workers in readymade garments industry. International Design Journal, 11(6), 225-232. doi: 10.21608/idj.2021.205077
Zainab Abdelhafeez Farghaly; Sawsan Mohamed Dia Al-Din Al-Muslimi; Esraa Abdel Moneim Hosseini. "The effect of employing Radiesthesia to improve the performance of the sewing workers in readymade garments industry". International Design Journal, 11, 6, 2021, 225-232. doi: 10.21608/idj.2021.205077
Farghaly, Z., Al-Muslimi, S., Hosseini, E. (2021). 'The effect of employing Radiesthesia to improve the performance of the sewing workers in readymade garments industry', International Design Journal, 11(6), pp. 225-232. doi: 10.21608/idj.2021.205077
Farghaly, Z., Al-Muslimi, S., Hosseini, E. The effect of employing Radiesthesia to improve the performance of the sewing workers in readymade garments industry. International Design Journal, 2021; 11(6): 225-232. doi: 10.21608/idj.2021.205077
The effect of employing Radiesthesia to improve the performance of the sewing workers in readymade garments industry
1Dept. of Clothing and textile Faculty of faculty of home economy, Helwan University
2Professor, Faculty of Science for Girls, Al-Azhar University
3PhD Student
Abstract
The aim of the research is to use bio-energy sciences, including the science of "Radisthesia", to improve the performance of sewing workers in ready-made garment factories through the application of some of the methods of this science, and the application of research tools, which consisted of an open questionnaire to determine the problems and risks of the work of knitting workers in the (operating) hall.A form evaluating the performance of sewing workers in the T-shirt production line to evaluate the performance of workers while working inside the ready-made garment factory (the research site).The performance rate of the workers was measured before preparing for the experiment, then a modification was made in the shape of the production line and some of the machines were changed due to their conflict with a ground power line full of harmful charges using the methods of radisthasia.In addition to the voltage and energy measuring devices, which are the IK pendulum and the vertical pendulum to find out the places of high pressure and the ground power lines with high charges, as well as the use of the voltameter and the Teslameter to measure the ratios of these charges and their impact on the workers andConsidering the exact distances between the machines, as well as the use of electric combs that were placed on the main cable feeding the machines to collect paths of electric charge and prevents them from spreadingWhere the effect of all these stresses on the performance level of workers was shown, and after the adjustment, this effect decreased and the productivity rate increased, as the results indicated that there were statistically significant differences between the average scores of workers’ performance, where the daily production level before preparing the experiment ranged from 4200 to 4500 and after preparing the experiment increased The production rate ranges from 4700 to 4800.
1-Ahmed Fahim Barbary: “The effect of production line design on reducing operating time in atypical ready-made garment factories in Egypt.” Unpublished PhD thesis, Faculty of Applied Arts - Benha University (2015).
2-Zainab Abdel Hafeez Farghaly: Ready-made clothes between preparation and production, 2nd floor, Cairo, Dar Al-Fikr Al-Arabi (2006)
3- Samir Hammouda: Studying the effect of engineering volumes on the design of buildings suitable for health through the behavior of electromagnetic waves, an unpublished PhD thesis, Faculty of Engineering - Damascus University (2017).
4-Abeer Hamed Sweidan: Using biogeometrics as an influence on the user's state of consciousness in internal fasting to improve mood within the space, published research, Faculty of Engineering, Delta University for Science and Technology (2015).
5-Mohamed Abdel Bari Wafa: The Impact of Earth Energy on Architecture, Master Thesis - Faculty of Fine Arts - Alexandria University (2008).
6-Iman Dianat (2016) Musculoskeletal symptoms among handicraft workers engaged in hand sewing tasks Journal of Occupational Health, 58(6)
7-Maria Antonietta Arleo, Layout Design for a Low Capacity Manufacturing Line.A Case Study. 2014
8-Gordana Colovic (2012), “Management of Technology Systems in Garment Industry'' Publishing India PVT. LTD.
9-Robin Herbert and Rebecca Plattus (Chapter Editors) (2011)"Clothing and Finished Textile Products", Encyclopeadea of worl health and Safety, ILO
10-Ibrahem Karim: (2010) Back to Future for Mankind, Bio Geometry Consulting Ltd, Egypt .
Williamson,Tom. (1993)Dowsing New Light on an Ancient Art.Great Britain:St Edmunds bury press limited,