1- Halder, P., C. L. Karmarker, B. Kundu and T. Daniel (2018). "Evaluation of factors affecting the productivity of RMG in Bangladesh: A fuzzy AHP approach." International journal of research in industrial engineering 7(1): 51-60.
2- Jayakumar, A. and A. K. Krishnaraj (2017). "Productivity improvement in stitching section of a garment manufacturing company." Int. J. Innov. Res. Adv. Eng 4: 8-11.
3- Johnson, P., & Lee, S. (2020). Efficiency Metrics in Garment Manufacturing. International Journal of Production Research, 58(4), 897-910.
4- Khatun, M. M. (2013). "Application of industrial engineering technique for better productivity in garments production." International Journal of Science, Environment and Technology 2(6): 1361-1369.
5- Kumar, R. (2016). Technological Innovations in the Garment Industry: An Overview. Journal of Fashion Technology and Textile Engineering, 4(1), 58-68.
6- MA, S., M. Zawad and T. Rahman (2023). "Productivity improvement of a sewing line of a garment factory by line balancing." Research Journal of Engineering Sciences ISSN 2278: 9472.
7- Mazumder, S. (2014). "Productivity improvement in readymade garments industry: a case study."
8- Moktadir, M. A., S. Ahmed, F. T. Zohra and R. Sultana (2017). "Productivity improvement by work study technique: a case on leather products industry of Bangladesh." Ind. Eng. Manag 6(1): 1000207.
9- Nguyen, T., Tran, H., & Le, V. (2019). The Impact of Standard Minute Value on Productivity in Garment Manufacturing. Journal of Textile and Apparel, Technology and Management, 9(3), 45-59.
10- Rahman, M., & Siddiqui, T. (2015). Workforce Training and Its Impact on Productivity in Garment Factories. Journal of Human Resources Management, 6(2), 134-145.
11- Rana, M. B., Islam, R., & Ahmed, S. (2020). Supply Chain Management in the Ready-Made Garment Industry: Practices and Performance. Global Journal of Logistics and Supply Chain Management, 10(1), 45-58.
12- Samad, M. A., P. P. Chowdhury, G. Rabbani and M. N. A. S. Uzzal (2023). "Study of a Sewing Line of an RMG Factory and Productivity Improvement through Line Balancing." Asian Journal of Engineering and Applied Technology 12(1): 1-9.
13- Smith, R., & Jones, T. (2017). Productivity Measurement in the Ready-Made Garment Industry. Journal of Fashion Technology and Textile Engineering, 5(1), 34-48.
14- Shumon, M. R. H., K. Arif-Uz-Zaman, A. Rahman and B. Khulna (2010). Productivity improvement through line balancing in apparel industries. Proceedings of the 2010 International Conference on Industrial Engineering and Operations Management.
15- Stevenson, W. J., M. Hojati and J. Cao (2014). Operations management, McGraw-Hill Education New York.
16- ur Rehman, A., M. B. Ramzan, M. Shafiq, A. Rasheed, M. S. Naeem and M. M. Savino (2019). "Productivity improvement through time study approach: a case study from an apparel manufacturing industry of Pakistan." Procedia Manufacturing 39: 1447-1454.